As tested in G27D iWave devkit,
- Once “poweroff” command is given, SOM will be completely OFF.
- To power ON the SOM, switch OFF and switch ON the Power ON/ OFF Switch present in the G27D devkit.
G27M SOM Power ON/OFF:
- Once “poweroff” command is given, SOM will be completely OFF.
- To power ON the SOM again, the switch present in the SOM can be pressed for maximum 2secs. This case is valid with or without connecting the RTC battery.
- After the first power-ON, power OFF the SOM by a long press of the switch present in the G27M SOM.
- After this, G27M SOM can be booted only by pressing the ON_OFF_BUTTON (switch present in the SOM). This can be done only when RTC battery is connected.
For further product inquiries, please get in touch with our sales team at mktg@iwave-global.com
Please find the detailed product information here:
i.MX 8QuadMax/QuadPlus SMARC System on Module